Description
In this session, we'll walk through what you need to perform a pipe-to-pond drainage study in Civil 3D software, beginning to end. If you have to pipe the stormwater to the proposed detention pond or get it there by overland channel, you'll see what it takes to create the study. This session will be fast and furious, but you'll leave with the step-by-step process to perform the design. Hope to see you there!
Key Learnings
- Learn how to create catchments and apply them to elements in design.
- Learn about the design elements needed for the workflow.
- Learn how to use new functionality provided in Civil 3D 2027.
- Learn how to validate and assess your design with reporting.
Tags
Product | |
Topics |
People who like this class also liked
Instructional Demo
Overcoming the Seven Deadly Sins of Civil 3D Project Performance
Instructional Demo
MASTERING MEGA PROJECTS: AN INFRASTRUCTURE BLUEPRINT TO PROJECT DELIVERY
Instructional Demo