Description
What happens when mega projects push Revit beyond its limits? For Multiconsult, 30+ minute open and sync times became a critical barrier across multidisciplinary teams working on highly detailed healthcare projects. In this session, we'll show how Autodesk and Multiconsult partnered to expose performance bottlenecks by analyzing journal data, model structures, and sync patterns. Together, we optimized linking strategies, streamlined sync workflows, and strengthened model health practices, turning insights into targeted Revit hotfixes addressing scalability challenges in loading and regeneration. This collaboration built trust and delivered shared value. Discover how this work is driving scalable, cloud-centric workflows and how to apply it.
Key Learnings
- Analyze large-model performance bottlenecks using journal data and workflow patterns.
- Evaluate how linking strategies, sync behavior and model setup impact project timelines and team productivity.
- Apply optimization strategies to improve model health, reduce open and sync times, and boost delivery efficiency.
- Assess how collaboration with Autodesk builds trust, improves performance, and influences future product capabilities.