Description
The cooperative approach of IPA fundamentally reforms conventional project execution at many levels with the goal of successfully realizing construction projects in terms of quality, schedules, and costs. Due to the complex user requirements and simultaneously intense time pressure, the client has opted for the integrated project delivery (IPD) method for the new laboratory building in Berlin. The new laboratory and research building is expected to be completed by 2028. A critical foundation for success is the model-based collaboration of the involved disciplines from planning and implementation. For this, interdisciplinary and process-spanning collaboration was organized and established with the suitable common data environment to efficiently design the participants' processes and automate them as much as possible.
Key Learnings
- Learn how the cooperative approach of IPA has led to joint decision making in all aspects of the project.
- Learn about the cooperative approach, including addressing requirements and implementations, and defining processes and their technical execution.
- Learn about profound advances in data-based collaboration, process, and interdisciplinary integration.
Downloads
Tags
Product | |
Industries | |
Topics |