Description
Can a multidisciplinary team across countries and companies deliver a better wastewater treatment plant, faster, by working as one? At AU 2026, Sweco's Zinta Rize shares the Kongsberg WWTP: a project that doubled capacity while meeting strict EU standards. Using Plant 3D, Revit, Civil 3D, and ACC as a single source of truth, plus VR reviews in Autodesk Workshop XR, the team broke silos and improved coordination. Results: 25% efficiency gain, 15% less 3D effort, and major reductions in 2D drafting. Discover how integrated BIM, cloud workflows, and immersive collaboration enabled smarter decisions, faster delivery, and a more sustainable, future-ready facility.
Key Learnings
- Cross-company collaboration: strategies for coordinating distributed teams: engineers, architects and producers using ACC.
- Leveraging Workshop XR with BIM workflows to identify early issues and plan the installation phase.
- Learn how an integrated workflow can yield quantifiable benefits, 25% boost in overall efficiency, reduction in 2D drawings.
- Connect design tools like Autodesk Plant 3D, Inventor, Revit, and Civil 3D through FORMA (ACC) to establish real time 3D view